5 + 4 = “principle, scheme, interface, investment, alteration + risk analysis for system safety, energy conservation and environmental protection, land use, and social stability
Project’s design quality control flow:
Design →Check →System responsible personnel →Chief engineer of each design office →Chief engineer of project → EDI’s vice chief engineer in charge of sub-institute