Technical communications in and out of EDI
 

 

  

  1. Power supply & substation design office and automation design office work division meeting
  2. Shenzhen metro No. 11 line AC & DC power supply system capacitance check discussion meeting
  3. Beijing metro equal current technical meeting
  4. Technical meeting of overhead rigid catenary adopted on viaduct
  5. Electric power, M&E and automation discipline work division meeting
  6. Discussion meeting ofNanjingmetro No. 3 line AC medium voltage ring network protection distribution scenario
  7. Interface meeting of electricity design office, automation design office, E&M design office and substation design office
  8. Technical scenario discussion for Litang-Zhanjiang railway electrification renovation engineering
  9. Guangzhou metro No. 4 line engineering power supply system design review
  10. Mingdianshe OCStestmonitoring unit technical communication
  11. Technical communication of 10kV cable and accessories with Dongchangniu Co.
  12. Technical communication of electrical power quality control and harmonic control
  13. OCS design department technical discussion meeting
 

Copy right: China Railway Electrification Survey Design & Research Institute Co. Ltd. 2013-2023 Certificate: No. 05002270 (Tianjin)

Company address: No. 33 Jiangdu Road, Hedong District, Tianjin Tel(Fax):022-24340602 Tel(Fax):023-98217